EDI Environmental Dynamics Inc. (EDI) was retained by Barkley Project Group to complete an Environmental Overview Assessment (EOA) for development of a transmission line (TL) (the Project) associated with the proposed Little Nitinat Hydropower Project, on southern Vancouver Island, approximately 45 km south of Port Alberni. Three transmission line routes; Bam field Mainline, Caycuse and Youbou, are considered in this EOA of which one will be selected for additional detailed design and further field assessment. The transmission line is required to interconnect the proposed hydropower project with a BC Hydro dist ribution line. Specific objectives of this EOA were to :